Skip to content
JaWork

User Guide · Gantt

Plan on the Gantt chart

2 min read · Updated

The Gantt chart shows every issue of a project as a bar on a timeline, from its start date to its due date. Arrows between bars show which work has to finish before other work can start.

The Gantt chart of Client Portal, with tasks, links between them, a milestone and the orange Today line

Open the Gantt chart

Open the project and click Gantt. Issues are listed on the left, in their groups, and drawn as bars on the right. The orange line marks today.

Change dates

  • Drag a bar to move the work to other days.
  • Drag either end of a bar to change its start date or due date.

The issue’s dates change at once, on the board and in every list.

Drag from the end of one bar to the start of another to draw a link. The second issue now depends on the first. The number of links an issue has shows beside its name, for example 2 links.

Add work

At the bottom of the list, click Add task for a new issue or Add task group to group several. Click Add at the top right for more choices, such as a milestone.

A milestone is a single date, drawn as a diamond: blue when it is ahead, green when done and red when overdue.

Find your way around

  • Month changes the time scale.
  • View chooses what is shown, such as links and the release dates.
  • Group by groups the rows, for example by assignee.
  • Click a row to select it, double-click or press Enter to open the issue, press Tab or Shift+Tab to indent or outdent it, and right-click for more actions.

Tip: Portfolio, in the menu on the left, shows every project on one timeline.

Dates you set here show up on My Calendar too.

Still stuck? The assistant answers from these guides, and a person takes over when it can't.

Chat with us
Next · DocumentsDocuments — notes, sheets, diagrams and mind maps →